The So good install at Axe Valley Academy went ahead seamlessly. From design to install we managed to complete this job within a three day turnaround. All the graphics were produced at actual size when designing, so that when the design was approved all the designs could be sent to print. This enabled us to send to print with the least amount of delay as possible.
The install was an extremely urgent install with time being critical as the caterer wanted the unit up and running for when the students returned from holiday. All the items were prepped before hand and were produced in such a way to allow the installation team to apply with ease. Before we apply any new graphics we always try and ensure all the surfaces are clear and undamaged as this can sometimes effect the look of the graphic when applied.
The final product on the units with the restaurant reinvigorated the old units giving them a clean and fresh appearance.
All items are protected with a high quality durable laminate which is ideal in a catering environment. All surfaces are now easily cleanable and the application of the graphics allows the units to be interchangeable if needed.
As the videos show our expert team breathed new life into the schools tired units.